Garage build – day 18

The garage is almost finished! The last slabs for the path have been laid, along with the shed base and the garage floor. When the concrete floor is dry, the builder needs to build some supporting pillars for the door and then he is finished and we can start with the remaining jobs – the interior fit out, getting the garage door and electrics installed etc.