Now that the facias, window and side door (minus bottom panel) are fitted it looks a lot more complete. The path down the side of the garage has also been started, although we’ve ran out of slabs, a combination of not ordering enough and some breaking when they were laid.
I’ve been told the concrete floor is going down on Friday, so I really need to hurry up and get the garage door ordered.