Garage build – day 19

An internal picture today, as the piers either side of the door were the last bits that the builder needed to do, so nothing has changed outside. The pace of work (and frequency of updates) will slow down a bit now that it is down to me to do the work, but the next task is to paint the walls inside the garage white, to keep the dust down and make the garage a bit brighter.

The door has been ordered, so that should be installed in the next few weeks, which means we will be able to get the electrician in to finish the wiring and then I’ll be able to park the MR2 inside!