Garden project – new veranda

IMG_3091

The framework for the new veranda is up! Now we have three weeks to paint it, before the polycarbonate roof panels are fitted.

The job went mostly to plan, the only issue being that during the removal of the old veranda a piece of wood fell into the drain collector. This wasn’t a problem until I emptied Owen’s bath, which overwhelmed the drain, causing it to back up and overflow out of the boiler drain pipe. The first I heard about it was when the builder shouted up to say that there was a problem with the boiler. I came outside to a flood of water pouring out of the boiler cupboard, I was glad to realise it was the bath water, rather than an expensive sounding boiler issue. We were able to unblock the drain and it gave Jen and I the kick we needed to clear out the boiler cupboard which had become a bit of a dumping ground.