Last weekend I managed to tick off another of my goals for 2018 – by volunteering to do some trail building at Cannock Chase with Chase Trails. Cannock Chase is my nearest trail centre, and the one I ride the most, so I had been feeling like I should put something back.
Trail building session run every Sunday – meeting at 10:00 at the Cannock Chase Cycle Centre, and volunteers are encouraged to join in. I was surprised to find that I was the only new volunteer, joining the small team of regulars – given how many people ride the trails I expected there to be a bigger team maintaining the trails. Having said that, Alex, who ran the skills course I did last month also joined for a few hours.
They may lack helpers, but the trail builders were well equipped – the first job (after the health and safety briefing) was loading tools into their awesome remote control mini dumper – much easier than carrying them up the hill! The dumper was also great for collecting the materials to surface the trail and for digging.
We were working on the first part of the “Rock N Rollers” section, which will be renamed “Snakes and Adders”. The first part will stay much the same, but the second part will be totally different when it opens.
At the worksite the first task was to finish digging a trench for a drainage pipe – I was impressed at how much effort goes into making sure water does not run down/pool on the trail. It is definitely appreciated, especially as I mainly ride at Cannock in the winter. With the pipe fitted and covered up, the trail surface could be laid. It was quite a slick operation, with one person using the mini dumper to bring the material, two to spread and shape it and another using the whacker to compact it. We made swift progress until reaching the next section requiring drainage work, and the cycle repeated. Before long it was time to pack up the tools and have some cake, having resurfaced about 25 metres of trail and dug three drainage channels.
You may be thinking that 25m isn’t a lot of trail to have been resurfaced in a day, or week, as these build sessions happen weekly. However, to work quicker they need more volunteers – so if you are a regular up at Cannock Chase, please consider joining the trail builders for a day, or even for an hour as you are riding past! I found it to be a fun and rewarding day and I am extra keen to ride the “Snakes and Ladders section, knowing that I helped build it. I will be joining Chase Trails again in the future for more trail building – hopefully I’ll see you there too!