An internal picture today, as the piers either side of the door were the last bits that the builder needed to do, so nothing has changed outside. The pace of work (and frequency of updates) will slow down a bit now that it is down to me to do the work, but the next task is to paint the walls inside the garage white, to keep the dust down and make the garage a bit brighter.
The door has been ordered, so that should be installed in the next few weeks, which means we will be able to get the electrician in to finish the wiring and then I’ll be able to park the MR2 inside!
The garage is almost finished! The last slabs for the path have been laid, along with the shed base and the garage floor. When the concrete floor is dry, the builder needs to build some supporting pillars for the door and then he is finished and we can start with the remaining jobs – the interior fit out, getting the garage door and electrics installed etc.
I didn’t post yesterday, as the visually there wasn’t much different from
The brickwork for the walls is now complete and work on the roof has started. The wall plates and joists have been fitted and the boarding is about half done. The roofer will finish off the roof on Tuesday and the window and personnel door will be fitted on Wednesday. Work has also started on the path down the side of the garage and the base for the shed. The next step is to fit the steel lintel above what will be the garage door.

The builders have made good progress, all the walls have been complete to floor level with engineering bricks and they have started building up the main walls. The floor is due to be laid early next week.